Skip to content

YouTube TV guide

How to change channel order on YouTube TV

Quick answers about reordering / customising the channel guide on YouTube TV — and a cheaper alternative for cord-cutters who want everything in one subscription.

TL;DR: YouTube TV doesn’t allow free-form channel reordering, but you can customise the Live tab via Settings → Live guide → Customise channels. Star (favorite) channels get a ‘Top picks’ row. Hidden channels disappear from the guide entirely. The order itself is fixed by network. If you want the same coverage at half the price, Slam Dunk Zone covers the major networks + regional sports + 4,000+ extra channels for $39.95/mo on up to 6 devices, no add-ons.

The short answer: reordering / customising the channel guide

YouTube TV doesn’t allow free-form channel reordering, but you can customise the Live tab via Settings → Live guide → Customise channels. Star (favorite) channels get a ‘Top picks’ row. Hidden channels disappear from the guide entirely. The order itself is fixed by network.

The longer story is about how YouTube TV structures its subscription tiers and how cord-cutters actually use them. Below is the practical version, including what most articles leave out.

Most cord-cutters land on this question because they are mid-comparison shopping — already weighing YouTube TV against cable, against another live-TV streaming service, or against trying to piece together a custom bundle of standalone apps. The honest answer almost always involves trade-offs the marketing pages do not explain clearly: what is in the base plan, what costs extra, what the regional fine print does to your specific zip code, and how the add-on math compounds over a year.

What it actually costs

YouTube TV is currently $82.99/mo for the base plan. Add-ons (4K Plus, Sports Plus, premium channels) stack on top — most cord-cutters pay $90–$110/mo once one or two add-ons are in the cart.

By comparison, Slam Dunk Zone is $39.95/mo flat — same major networks plus regional sports plus 4,000+ channels YouTube TV doesn’t carry, with no add-on tier. At YouTube TV, you spend roughly $82.99/mo. At Slam Dunk Zone you spend $39.95/mo. That’s $43.04/mo back, or $516/year saved.

Headline price is also not the only cost driver. YouTube TV has raised its base plan four times since launch, with each increase running $5–$10/mo. If you’ve subscribed for two years, the price you signed up at is now $15–$20/mo lower than what you pay today. SDZ is built on a different cost model — a flat-rate cord-cutter membership that has not carried that kind of inflation curve.

What most cord-cutters miss

YouTube TV is well-built for what it is — a polished US-market live-TV service. The catch is what it does NOT do well: international content, regional-language channels, niche sports networks, and 24/7 channel lineups beyond US broadcast and major cable. If your watching habits skew outside the US-network mainstream, you outgrow YouTube TV fast.

Three concrete examples of the gap. First, regional sports networks: YouTube TV carries most US RSNs in most markets, but if you’re in one of the half-dozen markets where the carriage deal expired, your local NBA or MLB games are simply unavailable on the service — and there’s no add-on path to get them back. Second, international sports: F1, cricket, Indian Premier League, niche European football leagues, rugby — none of these are on YouTube TV’s base plan and most are not available as add-ons at all. Third, foreign-language family channels: a household where Spanish, Portuguese, Arabic, Hindi, or Vietnamese channels matter cannot solve that need on YouTube TV alone.

The reason these gaps exist is structural, not temporary. YouTube TV licenses content one network at a time at US-market rates and passes the cost through to subscribers. SDZ’s model — operator-direct fulfillment with international tiers built in — covers those gaps without forcing the subscriber into multiple parallel subscriptions.

Real total monthly cost when add-ons stack

The cleanest way to compare YouTube TV against alternatives is to add up what you’d actually subscribe to over a year. A typical sports-focused household ends up with: YouTube TV base ($82.99/mo), Sports Plus ($11.99), 4K Plus ($9.99), and one premium tier (Max at $15.99). That’s roughly $120/mo, or $1,440/year.

The same household on Slam Dunk Zone pays $39.95/mo flat — about $480/year — and gets the same major broadcast networks, the regional sports networks, the international tiers, and the premium content tier all bundled in. Net annual savings: roughly $960. That covers a Firestick upgrade, a year of internet upgrade, and still leaves money over.

The math gets more lopsided for households with multiple TVs or a non-English-language need. YouTube TV’s simultaneous-stream rules and lack of international tiers force most non-trivial households into multiple parallel subscriptions, which adds another $20–$40/mo. SDZ’s 6-device cap and bundled international tiers absorb both of those costs at no additional charge.

How Slam Dunk Zone handles the same need

Slam Dunk Zone covers the same major networks YouTube TV does — plus regional sports networks, plus international/foreign-language tiers, plus a deeper movie/TV-series VOD library. Same use case, different value math: $39.95/mo vs $82.99/mo, no add-on layer, up to 6 simultaneous streams.

Slam Dunk Zone is operated since 2018, the streaming portal that has served cord-cutters since 2018. Same back-end infrastructure, same 24/7 support, but priced at $39.95/mo with no contract.

If you want one subscription that replaces cable plus the four streaming services you’re piecing together to fill the gaps, Slam Dunk Zone is the cleanest answer in 2026. Sign up for $39.95/mo and you’re streaming within 60 seconds.

  YouTube TV Slam Dunk Zone
Monthly cost$82.99/mo$39.95
Channels (base)85+5,000+ HD
Simultaneous streams3 (unlimited at home)Up to 6
Add-ons4K $9.99 · Sports Plus $11.99Included
Regional sportsMost US RSNsAll major US RSNs + international
ContractMonth-to-monthMonth-to-month

How To Change Order Of Channels On Youtube Tv — frequently asked

How does Slam Dunk Zone compare on price?

Slam Dunk Zone is $39.95/mo flat — no contract, no taxes-and-fees inflation, no premium-channel up-charge. That’s about half the cost of YouTube TV ($82.99/mo) or Hulu Live ($82.99/mo), and roughly a third of a typical cable bundle ($120–$220/mo).

Do I need a contract?

No. SDZ is month-to-month. Cancel from the member portal anytime — no retention call, no early-termination fee.

How many devices can I stream on at once?

Up to 6 devices simultaneously per membership. Living-room TV + bedroom TV + two phones + a tablet + a laptop, no one gets bumped.

Is sports coverage really included?

Yes — NFL, NBA, MLB, college, UFC, soccer, golf, tennis, plus regional sports networks. No extra tier or premium charge.

What if I want to try it before committing?

SDZ is month-to-month, so the first month is effectively your trial. Sign up takes about 60 seconds.

Tip-off

Stop paying $150 for cable.

Same sports. More channels. More devices. $39.95/mo.

Operating since 2018 · Cancel anytime · No contract